Here are the bathroom materials being delivered. Maybe I got carried away with my camera work, but seeing that only one man was delivering so many boxes by himself, I had to see and capture how he would do that!
Jeremy helped carry the materials in; I'm thankful he had the day off on delivery day. How things would have been brought in if he hadn't, I have no idea.
Next are some work-in-progress photos.
| the support wall for the tub surround You can see one of the sinks that are staying. |
| My son at work installing the surround. I don't know why I have the streaks of color running on the right side. If anyone can tell me, I'd appreciate it. |
My new tub's side measures only 16 inches from the floor. I checked my ability to get in and out of it at Lowe's. I'm looking forward to the bathroom being done so I can take a "test drive" in the new tub in my lovely new bathroom.
Here are some before photos of other areas in the bathroom.
| old cracked toilet by garden tub The garden tub also took up lots of room! |
| mirrors, mirrors, mirrors! five in all...in a bathroom measuring about 9 x 12 feet These two were given to a granddaughter. |
| curious Max wondering where the shower went :D |
| new hotel-style towel bar It's on the wall above the two sinks. Another mirror had been there. I've left a mirror above each sink. That's quite enough for my taste. |
| the towel bar by the new tub |
